The construction range is divided into: civil engineering, building; steel structure, equipment, piping; DUCTING; lining / brick; corrosion, thermal insulation; electrical, instrumentation; pre-test; non-destructive testing; scaffolding, temporary set and so on.
The project is a joint EPC, lasting from April 1, 2014 to August 31, 2016.